Bhimashankar Ridge Power Services (Demo)
Fictional vendor. electrical mechanical.
Rate contract for the replacement old Hepa and Microvee filters of air handling unit at Trauma OT
RealDemoB.Y.L. Nair Ch. Hospital and T.N. Medical College · technical 74 × 70% + financial 83.7 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 86.2 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 9.6 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 95.8 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0.9 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 97.1 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 10.7 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Supply of day to day electrical materials required for maintenance in various departments at KEM Hospital
RealDemoKEM Hospital · technical 78.8 × 70% + financial 80.7 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 87.6 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 10.5 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 95.9 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 90.5 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 2.7 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Supply of various electrical material for maintenance department at Dr. R. N.
RealDemoHBTMC and Dr.R.N. Cooper Hospital · technical 78.4 × 70% + financial 87.4 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 92.6 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 10 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 90.1 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 95 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 9.4 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Miscellaneous Electrical Installation Work at various locations in Dr. R. N. Cooper Hospital.
RealDemoHBTMC and Dr.R.N. Cooper Hospital · technical 79.1 × 70% + financial 92.3 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 87.8 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 10.6 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 97.1 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0.3 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 93.2 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 2.7 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Various type of electrical and fabrication works in various wards
RealDemoPeripheral Hospitals · technical 84.8 × 70% + financial 79.2 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 86.7 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 8.7 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 97 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 90.8 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 6 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Modernization of ESCON make 02Nos Lifts Lift No 1 and 3 544kg 08Pssenger capacity installed in UGPG Hostel Building Gr plus 20 floor under KEM Hospital Parel
RealDemoMechanical and Electrical Department · technical 94 × 70% + financial 59.1 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 88.1 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 7.3 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 99.1 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 89.6 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 11.2 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Procurement of electrical items at GTBH
RealDemoPublic Health Department · technical 79.7 × 70% + financial 94.3 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 92.8 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 8.9 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 96.2 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 2.3 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 97.8 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 7 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
SITC of electrically operated compact portable scrubbing utilities at Kasturba Hospital
RealDemoPublic Health Department · technical 78.6 × 70% + financial 100 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 88.2 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 12.5 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 95.4 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 3.5 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
SITC of augmentation of electrical circuitry as per E Audit at 148 building of Kasturba Hospital
RealDemoPublic Health Department · technical 91.6 × 70% + financial 73.9 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 89.2 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 9.7 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 90.7 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 7.7 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Work of Provision and Deployment of High-Dielectric Corrugated Safety Barrier with Voltage Withstand Capacity up to 11 kV in Electrical Rooms at HBT Medical College and Dr. R. N. Cooper Hospital
RealDemoHBTMC and Dr.R.N. Cooper Hospital · technical 87.1 × 70% + financial 84.8 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 87.3 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 9.1 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0.4 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 95.5 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 10.3 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Providing fixing of air disinfection system for air handling units of various ICU and OTs of BY
RealDemoB.Y.L. Nair Ch. Hospital and T.N. Medical College · technical 89.2 × 70% + financial 82.6 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 90.6 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 8.6 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 1.7 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 92 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 6.6 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
repairs to 50 kva DG set and AMC for 12 months
RealDemoPeripheral Hospitals · technical 82 × 70% + financial 100 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 87.3 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 10.4 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 98.4 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 95.3 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 4.6 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Repair and Rewinding pump work at various location in KEM Hospital
RealDemoKEM Hospital · technical 87.2 × 70% + financial 92 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 92.8 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 11.4 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 93.4 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 5.4 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Rate contract for providing various routine electrical materials for Day to Day Maintenance at College building and Various Hostel under HBT Medical College
RealDemoHBTMC and Dr.R.N. Cooper Hospital · technical 83.8 × 70% + financial 100 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 89 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 11 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0.5 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 96.6 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 3.7 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Providing Shed on DG set at NHDC
RealDemoNair Dental Hospital · technical 92.4 × 70% + financial 84.7 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 92.8 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 9.1 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0.7 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 91.9 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 5.7 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Rerouting of Sewer line connection of R Bldg. near AC Plant of OPD Bldg.along with allied works in BYL Nair Ch.Hospital
RealDemoB.Y.L. Nair Ch. Hospital and T.N. Medical College · technical 86.8 × 70% + financial 97.8 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 91.3 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 9.5 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 97.5 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0.8 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 94.5 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 2.7 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Minor Civil repair of Lift Shaft of Lift No. 11, Multi-storey Building
RealDemoKEM Hospital · technical 86.3 × 70% + financial 100 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 85.7 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 6.7 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 97.9 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 95 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 3.7 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Providing and Fixing of Various Electrical, Fabrication Work at MMWD, Gynaec, FMWD, MOW Ward in Main Hospital Building at H.B.T.M.C. and Dr. R.N. Cooper Mun.Gen.
RealDemoHBTMC and Dr.R.N. Cooper Hospital · technical 89.1 × 70% + financial 93.8 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 89.7 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 10.7 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 94.5 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 6.4 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Electrification, Air Conditioning and Surveillance works to be carried out at various locations in KEM Hospital
RealDemoKEM Hospital · technical 97.1 × 70% + financial 75.6 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 92.8 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 7.5 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 98 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 93.3 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 11 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
SITC of HC plain_perforated GI Shutterand allied Works to secure electrical meter and service confines at ward 4 of Kasturba Hospital
RealDemoPublic Health Department · technical 92.2 × 70% + financial 91 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 91.1 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 8.6 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 1.1 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 92.9 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 4.5 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Removing, shifting, fixing , servcing and repairing of split AC
RealDemoPublic Health Department · technical 95.1 × 70% + financial 84.3 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 90 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 6.7 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 98.3 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0.5 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 94.8 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 10.2 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Work of Providing and Fixing of Ceiling Fan Tube Light and Exhaust Fan in various General Stores Room at Bharatratna Dr Babasaheb Ambedkar Hospital Kandivali west
RealDemoPeripheral Hospitals · technical 94.3 × 70% + financial 86.7 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 88.7 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 8.2 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 98.8 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 93.3 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 7.1 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Providing and Fixing of Electrical accessories and aesthetic light work in KEM Hospital
RealDemoKEM Hospital · technical 90.6 × 70% + financial 96.8 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 88.8 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 7.3 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 99.4 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 1.1 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 97.8 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 6.1 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Work of rectification a refurbishment of horizontal expansion of NOT a main pump room at Nair Hospit
RealDemoB.Y.L. Nair Ch. Hospital and T.N. Medical College · technical 89.3 × 70% + financial 100 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 86.5 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 7.4 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 99 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0.1 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 97.8 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 4.7 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Refilling and Maintenance of Fire Extinguishers at various location in KEM Hospital
RealDemoKEM Hospital · technical 91.4 × 70% + financial 98 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 87.2 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 8.3 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0.1 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 97.1 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 5.7 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
REPLCE AND DISMANTLING OF EXISTING ELECTRIC
RealDemoPeripheral Hospitals · technical 94.3 × 70% + financial 93.2 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 89.9 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 7.6 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 96.2 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 93.4 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 4 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Comprehensive contract with replacement of Hepa and Pre-filter for maintenance of Air Conditioning System of Clean Room and Transit Room at PCR lab of Kasturba Hospital for the period 3 Years
RealDemoPublic Health Department · technical 95.8 × 70% + financial 94.4 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 88.3 | Missed | 35% |
| Breakdown responsehours | technical | at most 8 | 6.7 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 93.7 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 3.5 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Prov fire Marshals
RealDemoNair Dental Hospital · technical 97.6 × 70% + financial 91.7 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 90.7 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 6.7 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 98.7 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0.1 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 95.2 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 7.9 | Missed | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Provision of infrastructure for shifting of AC maintenance department along with overhauling of Arogyapath of Nair Hospital
RealDemoB.Y.L. Nair Ch. Hospital and T.N. Medical College · technical 96.6 × 70% + financial 98.7 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 91.5 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 8.2 | Missed | 30% |
| Statutory test certificates% current | technical | at least 100 | 99.9 | Missed | 20% |
| Site safety incidentscount | technical | at most 0 | 0.5 | Missed | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 94.7 | Missed | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 2.7 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo
Replacement and re-installation of electrical and medical gas pipe line with allied
RealDemoHBTMC and Dr.R.N. Cooper Hospital · technical 100 × 70% + financial 100 × 30%
| Indicator | Envelope | Target | Reading | Result | Weight |
|---|---|---|---|---|---|
| Milestone adherence% milestones on time | technical | at least 90 | 92.8 | Met | 35% |
| Breakdown responsehours | technical | at most 8 | 6.7 | Met | 30% |
| Statutory test certificates% current | technical | at least 100 | 100 | Met | 20% |
| Site safety incidentscount | technical | at most 0 | 0 | Met | 15% |
| Bill accuracy% bills accepted first time | financial | at least 95 | 95.6 | Met | 60% |
| Cost variance% over awarded cost | financial | at most 5 | 4.9 | Met | 40% |
Source: title from MahaTenders Real; vendor and readings simulated Demo